site

01/open
integration
plan

02/closed
integration
plan

03/permeable
integration
plan

material

01 / open
The open scenario [s01 ] is situated in vacant territory, but all major infrastructure is present in the immediate vicinity. The open integration process suggests unpredictable growth of the camp. Any connection with the neighbouring infrastructure, enabled by its accessible spatial character, is possible. In the final stage of the s01 camp ’s development, it functions as a network node similar to the role played by the dispersed neighbouring settlements in the area.